八十年代以来,我国某些矿区陆续投产一批采高在3.5—5.0m的大采高综采面。总的说来大采高综采面的各项经济技术指标不如采高为3m左右的综采面。其原因是多方面的,其中之一是某些大采高综采面顺槽沿煤层顶板掘进在工作面端部区域形成底煤,底煤留设不当给端头采煤作业和顶板管理造成困难,影响综采面正常推进,同时也浪费煤炭资源。本文作者在现场调查基础上,通过理论分析,提出了底煤的合理型式和留设方法以及相应的端头技术管理措施,并推导出底煤尺寸的计算公式,分析了影响底煤型式和尺寸的参数。
Since the 1980s, some mining areas in China successively put into operation a batch of large mining and fully mechanized mining face with a height of 3.5-5.0m. In general, the economic and technical indexes of the fully mechanized mining face with a large mining height are not as good as those of the fully mechanized mining face with a height of about 3m. There are many reasons for this. One of them is that some of the fully mechanized mining face with fully mechanized mining face forms a coal seam along the roof of the coal seam in the end area of the working face, which results in improper end-coal mining and roof management Difficult to affect the normal progress of fully mechanized coal face, but also a waste of coal resources. On the basis of field survey, the author puts forward the reasonable type and leaving method of end coal and corresponding technical management measures of end coal, and deduces the calculation formula of bottom coal size, analyzes the influence of coal type and size The parameters.