要建成一个高质量的安全监测系统,除需要好的监测设计方案外,还要切实抓好监测工程的施工管理。在碾压混凝土内埋设监测仪器有别于常态混凝土施工。根据碾压混凝土施工特点,结合施工现场的实际情况,制订切实可行的埋设方法是十分必要的。要根据主体施工进度编制安全监测工程实施计划,有步骤、有计划地进行仪器埋设、安装、维护和观测。认真做好仪器埋设安装前的准备工作,采用合适的埋设方法,以减少对主体工程的干扰。仪器埋设时必须对施工现场和后续施工情况具有预见性,以避免意外损坏。在监测工程实施过程中,要注重监测设施和数据的可靠性,还要注意施工的安全性,包括人身安全和仪器设备的安全
To build a high-quality safety monitoring system, in addition to the need for a good monitoring design, but also effectively monitor the construction management. Embedding monitoring instruments in RCC differs from normal concrete construction. According to the characteristics of roller compacted concrete construction, combined with the actual situation at the construction site, it is necessary to formulate a practical method of laying. According to the main construction progress compilation of safety monitoring project implementation plan, step by step, the planned installation, installation, maintenance and observation. Conscientiously do a good job of preparing the instrument for installation before installation, and use appropriate methods to reduce the interference to the main project. The equipment must be predictive of the construction site and subsequent construction conditions to prevent accidental damage. In the monitoring project implementation process, we should pay attention to monitoring the reliability of facilities and data, but also pay attention to the safety of construction, including personal safety and equipment safety