论文部分内容阅读
水电和木材水运都依托江河水资源来建设和生产。在木材水运河道上兴建水电站(闸坝)时,应遵照国家河道综合利用的政策法令、统筹兼顾,既利于发电灌溉,又利于通航过木,合理解决发电与漂木的矛盾。如有可能或者已造成木材过坝(闸)经济损失的,应在国家政策和计划指导下,采取部门、企业间经济补偿的办法予以妥善解决。那么,怎样进行木材过坝经济损失补偿的核算,做到公平合理呢?此问题涉及政策、计
Both hydropower and timber water transport are built and produced on the basis of river water resources. The construction of hydropower stations (sluices) on timber waterway should comply with the policies and decrees of comprehensive utilization of the national rivers and take all factors into consideration. This will not only help power generation and irrigation, but also facilitate the navigation through the wood so as to reasonably solve the contradiction between power generation and drifting wood. If it is possible or has caused the economic loss of wood dam (gate), it should be solved properly under the guidance of national policies and plans by means of economic compensation among departments and enterprises. So, how to carry out the calculation of compensation for the economic loss of timber dam, so that it is fair and reasonable? This question involves the policy,