云南省昆明市恒隆广场主楼高度达349 m,地下4层,位于地震带。为满足抗震要求,主楼剪力墙和地下室均采用了大量钢骨结构,由于钢柱及钢板墙体量大、厚度厚、分布密,导致钢筋工程、模板工程、混凝土工程的施工质量控制难度增大,故需要解决各项工作与厚重钢骨施工的配合问题。经分析研究并通过各项施工质量控制技术的应用,终使地下室结构得以高质量完工,亦为今后类似超高层结构的施工提供了借鉴。
The main building of Hang Lung Plaza in Kunming City, Yunnan Province, is 349 m high and 4 floors underground, located in an earthquake zone. In order to meet the seismic requirements, a large number of steel structures are used in the main building shear walls and the basement. Due to the large amount of steel columns and steel wall, the thickness is thick and the distribution is dense, the construction quality control of reinforcing steel works, formwork engineering and concrete engineering is more difficult Therefore, it is necessary to solve the problem of cooperation between various work and heavy steel construction. Through the analysis and research and through the application of various construction quality control techniques, the basement structure can be finished with high quality, which also provides reference for the construction of similar super high-rise structures in the future.