论文部分内容阅读
采区巷道布置系统及主要参数的优化是一个多目标决策问题。本文利用非线性目标规划数学模型,以铜川矿务局东坡煤矿西下山采区为实例,讨论了该采区巷道布置系统及主要参数的优化问题。
Optimization of layout system and main parameters in mining area is a multi-objective decision-making problem. In this paper, we use the non-linear mathematical model of the target programming and take the Xiashan Mining Area of Dongpo Coal Mine of Tongchuan Mining Bureau as an example to discuss the optimization of the roadway layout system and the main parameters in this mining area.