论文部分内容阅读
江西省宁都县交通局在公路建设中,积极配合水电、林业等部门,坚持“因地制宜” 和“山、水、田、林、路”综合治理的原则,做到兴建公路少占或不占农田;修河谷线时,兼顾护理河岸、治水保田;修山脊线时,注意松土绿化,拦阻雨水,减缓流速;修越岭线时,多做涵洞,分散水量,减小冲刷。施工中,断面放样力求准确,尽量不动老土,妥善处理弃土,以减少水土流失,宜林路线,坚持绿化。他们的主要经验和具体做法是: 一、合理规划,统筹安排 为了做到“山、水、田、林、路”综合治理,他们在1976年4月抽调20名技术人
In the highway construction, Ningde County Bureau of Communications of Jiangxi Province actively cooperates with the departments of hydropower and forestry and insists on the principle of “adjusting measures to local conditions” and “comprehensive management of mountain, water, field, forest and road” so as to achieve less or no occupation of farmland ; Repair river valley line, take care of the riparian, flood protection Tian; repair mountain ridge line, pay attention to loose soil green, blocking rain, slowing down the flow rate; repair Yue Ling line, do more culverts to disperse the amount of water to reduce erosion. During the construction, the section should be set out to be accurate, as far as possible not to move the old earth, properly dispose of spoil so as to reduce soil erosion, Yilin route and insist on greening. Their main experiences and concrete practices are as follows: I. Rational Planning and Overall Planning In order to achieve the comprehensive management of “mountain, water, field, forest and road”, they deployed 20 technicians in April 1976