矿山自动化的成就和工程项目采矿工业使用机器人或实现自动化,并非一种新的设想,近20年已获得了一些成就。固定设各:固定设备一般投资大,是应尽快实现自动化的主要项目。避免昂贵设备的错误操作,使固定设备在生产环节中起到关键作用,且要运转中省人都是自动化的原则。现在泵站、提升机、带式运输机、仓储设施和选矿厂的自动化程度都已很高,运转过程总是受到严格的监控。
Mine Automation Achievements and Engineering Projects The use of robots or the automation of the mining industry is not a new idea, and some achievements have been made in the last 20 years. Fixed set: Fixed equipment generally invests large, automation is the main project should be realized as soon as possible. Avoid the wrong operation of expensive equipment, so that fixed equipment plays a key role in the production process, and to run in the province are the principle of automation. The automation of pumping stations, hoists, belt conveyors, storage facilities and concentrators is now very high and the operation is always under strict monitoring.