霍林河矿务局是我国现代化露天煤矿之一,位于内蒙古哲里木盟霍林郭勒市境内,始建于1976年。1984年9月,设计能力为300万t/a的露天矿投产,1990年达到设计能力;二期工程的设计能力为700万t/a,1992年9月投产,1996年生产原煤521万t。“八五”期间,我们坚定不够地贯彻、执
The Huolinhe Mining Bureau is one of China’s modern open-pit coal mines. It is located in the city of Hollingur in the Zheliki League in Inner Mongolia and was built in 1976. In September 1984, the open-pit mine with a design capacity of 3 million t/a was put into operation and reached design capacity in 1990; the design capacity of the second-phase project was 7 million t/a. It was put into operation in September 1992 and the production of raw coal was 5.21 million tons in 1996. . During the “Eighth Five-Year Plan”, we implemented and executed firmly enough.