GPS real-time monitoring mine derrick deformation with baseline constraint

来源 :2012国际矿山测量学术论坛(proceedings of the joint international worksh | 被引量 : 0次 | 上传用户:mgghz
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
In order to monitor mine derrick deformation,an ambiguity search algorithm with baseline constraint was presented,and attitude determination of kinematical carrier was described based on the Rodrigues matrix.Finally,the rationality of the model was verified by project cases,and the result shows that the ambiguity search algorithm with baseline constraint is superior to the LAMBDA and MLAMBDA methods,and the ambiguity can be fixed with 7 epoch observations for 1 second sampling rate; The dynamic positioning accuracy of high-frequency GPS can reach up to millimeter level,and the corresponding precision of attitude information can be achieved 0.2 degree when the length of baseline is about 2 m; the method can provide accurate information for derrick stress analysis and failure evaluation.
其他文献
On the basis of 9 fixed sample plot materials,8 competition index were used,the interrelated relation between competition and growth of breast-height diameter was analysed with method of regression an
How to improve the accuracy of the Estimating and Locating of gross errors is the one of difficulties during observation data processing.In this article,error theory and reliability theory are combine
According to 2008 to 2011 Air Pollution Index monitoring data from Fangshan Environmental Protection Agency,and data analysis,the results show that air pollution index at Fangshan istrict is higher th
Two scenes of Landsat TM images of Mentougou District in 1996 and 2010 were used to calculate vegetation indexes and land surface temperature (LST).500m*500m grids were generated to extract about 5600
In order to further improve the recovery ratio of strip mining,the paper described optimal design principles of strip mining for multi-seam and thick coal seam based on effects on strip mining subside
Reconstruction of abandoned ground in an open-pit mine should satisfy with ecological restoration principle,mitigate environment problem caused by coal mining and recover production ability of natural
Mineral resources type cities flourished with mineral mining,mining is the primary leading economic industry.In different countries,un-same social system,different economic regulation,whatever rich or
This paper presents a new modeling methodology - 3-Dimensional (3D) modeling in condition of moving discrete data - for the point cloud data of mining tunnel and mined-out area.If the traditional mode
The traditional method treats gyro-side as strong side in underground control network which has proved to be not sustainable.When gyro-sides are added,condition equations are needed and the approximat
会议