论文部分内容阅读
人民胜利渠是新中国成立后在黄河下游兴建的第一个大型引黄灌溉工程。灌区自1952年4月开灌以来,经过40年的艰苦努力,已形成了“灌排并举、渠井结合、沉沙改土、科学用水”的灌溉模式,灌区生产水平有了大幅度提高。特别是1981年以来,为适应农村实行生产责任制后灌区用水的新特点,提高管理服务水平,在灌区管理方面进行了一系列改革,灌区生产面貌发生了根本变化。据统计,从1982年到1991年
The People’s Victory Canal is the first large-scale project to divert water from the Yellow River to the Yellow River after the founding of new China. After 40 years of hard work, the irrigated area has formed the irrigation mode of “irrigation and drainage simultaneously, combination of drainage and sedimentation, sedimentation and land improvement and scientific water use” since the irrigation was started in April 1952 and the production level of irrigation areas has been greatly improved. Especially since 1981, a series of reforms have been carried out in the management of irrigation districts to meet the new features of water use in irrigation districts after the implementation of the production responsibility system in rural areas, and the level of management services has been improved. The production landscape of irrigation districts has undergone fundamental changes. According to statistics, from 1982 to 1991