论文部分内容阅读
193/1放射性废液综合处理车间是为处理中国原子能科学研究院承担国防科研生产时期产生的放射性废液而建的。该处理车间于2003年底完成冷试验后,于2004年10月又完成了技改工作,为热试验做好了技术准备。根据上级《关于原子能院放射性废液综合处理车间热试验方案的批复》文件及中
193/1 Radioactive Wastewater Treatment Plant is designed to handle radioactive liquid waste generated by China Institute of Atomic Energy during the period of national defense scientific research and production. After finishing the cold test at the end of 2003, the treatment plant completed the technical renovation work again in October 2004 and made technical preparations for the thermal test. According to the higher level “on the IAEA radioactive waste comprehensive treatment workshop thermal test program approval” document and in