论文部分内容阅读
江肇高速西江特大桥主墩承台为深水承台,且施工时间处于洪水期,在施工方案上必须考虑如何抵抗洪水对承台套箱及施工平台的冲击,以保证承台能够顺利、安全完成。
The construction of the main pier of Jiangzhao Expressway Xijiang River Bridge is a deep-water cap, and the construction time is in flood period. The construction plan must consider how to resist the impact of flood on the cap-box and the construction platform so as to ensure that the cap can smoothly and safely carry out.