在设计工作中,计算暴雨径流可采用多种方法,通常的推理法是在给定具有一定频率的暴雨强度-历时关系和所研究流域的汇流时间的情况下来确定最大流量。流量过程线法是在提供径流随时间的变化过程,以及进一步迭加各子流域的径流时是优越的。然而,采用这些方法都要求较多的附加资料,特别是暴雨分布的详细资料。本文介绍一种概化的流量过程线法,目的在于对峰值和径流时间分配这两个因素进行工程性预
In design work, there are several methods that can be used to calculate stormwater runoff. The common reasoning method is to determine the maximum flow rate given a certain frequency of storm intensity-duration relationship and confluence time of the studied watershed. The flow process line method is superior in providing the process of runoff over time and further superimposing the runoff of each sub-catchment. However, the use of these methods requires more additional information, especially the details of the storm distribution. This article presents a generalized flow process line approach that aims to engineering the two factors of peak and runoff time distribution