论文部分内容阅读
1958年初,国务院批准以2.4亿元的投资,把石景山钢铁厂在第二个五年计划内,建成一个年产60万吨钢、140万吨铁的钢铁厂。双反运动中,全厂职工以万马奔腾之势,在一周之内就贴出了120万张大字报,冲击了保守和浪费,掀起了比先进、比多快好省的高潮。这时冶金部向各厂提出:“一厂变两厂,速度快一倍”的号召。经过我厂领导同志的深思和一部分工程技术人员的研究,认为是有可能实现这个号召的。但是苦于资金不能当家作主;设计方案自己不能决定,施工力量又很分散。
In early 1958, the State Council approved a 240 million yuan investment to build Shijingshan Iron and Steel Plant into a steel plant with an annual output of 600,000 tons of steel and 1.4 million tons of iron within the second five-year plan. During the anti-vice campaign, the entire factory workers in the tens of thousands of horses bolted the trend, posted 1.2 million posters within a week, which impacted the conservative and the wasteful ones and set off the climax of more advanced and more prosperous provinces. Metallurgy Department then proposed to the plants: “a factory to change two plants, twice as fast” call. After my factory leadership comrades thought and part of engineering and technical personnel research that is possible to achieve this call. However, suffering from capital can not be the masters; design programs can not decide on their own, and construction power is very scattered.