龙羊峡水电站枢纽异形泄流挑坎的体形几何尺寸计算

来源 :西北水电技术 | 被引量 : 0次 | 上传用户:fijihi
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
黄河龙羊峡水电站是在高深狭谷中兴建的一座大型水利枢纽工程.由于河床狭窄,泄水建筑物布置比较集中,下游消能区地质条件差且河道急剧弯折,给下泄高速水流的消能防冲问题带来了很大的困难.为了妥善地解决下游消能防冲问题,经设计与试验单位密切配合,通过长达十年之久的水工模型试验,经多方比较优选,找到了适合龙羊峡枢纽工程地形、地质条件和布置特点的异形挑流鼻坎,从而较合理地解决了该枢纽的泄洪消能问题. The Yellow River Longyangxia Hydropower Station is a large-scale water control project built in the deep valleys.Due to the narrow riverbed, the drainage structures are concentrated, the geological conditions in the downstream energy-dissipating areas are poor and the river bends sharply, Anti-scuffing problems have brought great difficulties.In order to properly solve the problem of downstream energy dissipation and scouring, the design and testing units in close cooperation, through a decade-long hydraulic model test, the more parties to find the best Suitable for Longyangxia Gorge project topography, geological conditions and the characteristics of the irregular shape picks nose ridge, which is more reasonable to solve the flood discharge and energy dissipation of the hub.
其他文献
金秋十月,硕果飘香。10月26日至29日,全国20多个省、币、自治区共计43名编委、联络员和特邀代表聚集广西北海市,参加切外经贸实务》杂志社1998年度全国通联工作会议。外经贸部人
一心扑在物价事业上的带头人──记辽宁省沈阳市物价局王秀珍同志王秀珍从事物价工作已经17年。1994年担任沈阳市物价局局长。在她的领导下,沈阳市物价局年年被评为辽宁省物价工作先
本文用浮块天平和勃莱斯顿(Preston)管测量了紊流边界层中的壁面剪应力。突然施加和除去逆压力梯度都会导致边界层失却平衡。在逆压力梯度时发觉勃莱斯顿管读数出现正负误差
黄河泥沙是利还是害,不同的认识,会产生不同的治河决策和治理效果。作者系统地研究了历史上黄河泥沙利害观的演变,分析了不同观点指导下治河实践的成败得失,指出历代治河的主
国家计委表彰全国物价工作先进集体名单北京市海淀区物价局北京市西城区物价检查所天津市物价检查所河北省秦皇岛市山海关区物价局河北省雄县物价局河北省物价检查所山西省临
建国初期,人们对灰贮放的复杂性认识不足,未选好足够容量的场址,电厂投产后不久灰场即贮满告急。一时找不到合适新址就利用原址堆高,但未注意堤坝土工问题,发生垮坝事故多起
学习语言的目的是运用语言进行交际,如何提高学生的交际能力是英语教学的重要任务,而交际策略是英语交际能力的重要组成部分。本文从交际策略的角度出发,提出了学生使用交际
一、地理位置与自然条件紧水滩水电站位于浙江省云和县境内,在瓯江上游大溪支流龙泉溪上,距商水市66km,距云和县城19km,上游库尾的龙泉县是浙江省主要木材产地。电站控制流
工程水文中,较普遍的问题是估算水库对洪峰流量的衰减效应。本文介绍的图解法将水库出流洪峰作为入流过程、水库蓄量、出口特征参变数的函数,直接确定洪峰出流量。本图解法建
本文所提出的有关大坝失事、破坏调查的初步结果,是由国际大坝会议(ICOLD)的爱德郝克(Ad HoC)大坝破坏统计分析委员会进行的.调查资料已列于以下的各个表格内,它包括了24个国