论文部分内容阅读
通过反思广东省“98·6”抗洪实践,得到以下启示:水利工程建设必须按照有关法规和程序进行,尊重科学,依法办事,以确保工程质量;实行防汛责任制,重在抓落实;水利工程管理体制亟待理顺,跨县(区)的工程必须有一个统一的协调机构;工程管理工作有待加强,管理人员素质尚待提高;水利建设效益巨大,回报丰厚;病险水库除险加固和江海堤围加固已成人们的共同愿望。搞水利建设“预则立,不预则废”,有备无患
By reflecting on the “98 · 6” flood fighting practice in Guangdong Province, we get the following enlightenment: The construction of water conservancy projects must be conducted in accordance with the relevant laws and regulations and procedures, respect for science and work in accordance with the law so as to ensure the quality of the projects; implement the flood control responsibility system, The management system needs to be straightened out. There must be a unified coordinating body for the projects across counties (districts). The project management needs to be strengthened and the quality of management personnel needs to be improved. The water conservancy construction has great benefits and returns, and the dangerous reservoirs are reinforced and reinforced by Jianghai Embankment reinforcement has become the common aspiration of people. Water conservancy construction “pre-set legislation, do not pre-waste,” preparedness