为了适应南水北调及其它大中型泵站试验研究的需要,江苏机电排灌工程研究所于1987年建成了水泵通用试验台。经过一年的调试、运行、试验,主要参数和功能均达到设计要求。江苏省水利厅于1988年6月7日至9日邀请大专院校、科研单位及有关部门的专家、教授、工程技术人员共46人。在江苏机电排灌工程研究所,对试验台进行评审、鉴定。(一)试验台主要工作参数:1.扬程:-6~21m2.流量:0.1~0.5m~3/s3.转矩:0~50kgf-m4.转速:0~1500r/min
In order to meet the needs of experimental research on the South-to-North Water Diversion Project and other large and medium-sized pumping stations, the Institute of Irrigation and Drainage Engineering of Jiangsu Electrical and Mechanical Services built a water pump universal test stand in 1987. After a year of commissioning, operation, testing, the main parameters and functions have reached the design requirements. Jiangsu Province Department of Water Resources in June 7, 1988 to 9 invited tertiary institutions, research institutes and relevant departments of experts, professors, engineers and technicians a total of 46 people. Mechanical and electrical irrigation and drainage in Jiangsu Institute of Engineering, the test stand for review, identification. (A) test bench main working parameters: 1. Head: -6 ~ 21m2. Flow: 0.1 ~ 0.5m ~ 3 / s3. Torque: 0 ~ 50kgf-m4. Speed: 0 ~ 1500r / min