论文部分内容阅读
力图减小施工期间金融风险的水电工程开发商们可能会考虑承包商设计法。与业主设计法相比,这种方法不仅能够减少工程费用,而且还可以避免延误工期。以伊朗目前在建的一座水电工程为例介绍了这种方法。
Hydropower developers who seek to reduce the financial risk during construction may consider the Contractor’s Design Law. Compared with the owners design method, this method can not only reduce the cost of the project, but also to avoid delays in the construction period. An example is given of a hydropower project under construction in Iran.