开展创先工作以来,红河供电局以供电可靠性为抓手,加强综合停电计划管理,开展设备缺陷分析,加强配网故障抢修管理,大力推广带电作业和提高转供电能力等,有效缩短了城市客户年均停电时间,供电可靠性显著提升。201 2年红河供电局城市客户年平均停电时间从2008年的42.28小时/户降低到了5.75小时/户,极大地提高了城区供电可靠性,为客户满意度提升奠定了坚实基础。
Since the establishment of the first work, Honghe Power Supply Bureau as the starting point for the reliability of power supply, strengthen integrated power outage plan management, equipment defect analysis, to strengthen the management of network failure repair, and vigorously promote live operations and improve power transmission capacity, effectively shortening the city Customer average outage time, power supply reliability significantly improved. In 2013, the average annual power outage of urban customers in Honghe Power Supply Bureau dropped from 42.28 hours per household in 2008 to 5.75 hours per household, which greatly improved the reliability of urban power supply and laid a solid foundation for customer satisfaction.