杭钢小型连轧工程主厂房柱基础采用钢筋混凝土独立基础,而设备基础的深层部分则采用振动沉管灌注桩。由于初步设计、方案选择以及图纸会审等多方面因素,采用先施工主厂房柱基础,后进行设备基础打桩的施工程序。在打桩过程中,经测量检查发现厂房柱基础产生了相当的位移...
In the small-scale continuous rolling project of Hangzhou Iron & Steel Co., Ltd., the main foundation of the main plant building adopts a reinforced concrete independent foundation, while in the deep part of the equipment foundation, the vibratory immersed cast-in-place pile is used. Due to many factors such as preliminary design, scheme selection, and drawing review, the construction of the main building pillar foundation was used first, followed by the construction procedure of the foundation piling. During the pile driving process, the measurement found that the building column base has generated a considerable displacement...