论文部分内容阅读
由于雷宾斯克水电站水力发电机组运行状态不令人满意 ,出现了一些与技术操作规程要求不相符合的情况 ,因此决定对其进行改造。拆卸了旧机组的磨损部件 ,安装了新机组并进行了调试
Due to the unsatisfactory operating status of the hydropower plant at Rybinsk, there was some inconsistency with the requirements of the technical codes of practice and it was decided to revamp it. Worn out parts of the old unit were disassembled, new units were installed and commissioned