1 概述昭平台水库建有一座总装机容量为6160kW(3×1600+1×1360)的水电站,经2台(4000+3200)kVA 变压器将发电机电压3.15kV 升压至35kV 后,与当地供电系统联网。另设有2台1000kVA 变压器将发电机电压3.15kV 升压至10kV 送至库区高压配电室,供水库尧沟泄洪闸、大坝照明、宾馆、库区供电降压变电站和附近工农业用电。昭平台水库除险加固后,因工程需要水电站一级站更新改
1 Overview Zhaopingtai Reservoir has a total installed capacity of 6160kW (3 × 1600 +1 × 1360) of the hydropower station, the 2 (4000 +3200) kVA transformer generator voltage 3.15kV boosted to 35kV, with the local power supply System networking. Another set of two 1000kVA transformer generator voltage 3.15kV boosted to 10kV sent to the reservoir high-voltage power distribution room for reservoir Yao ditch flood gates, dam lighting, hotels, reservoir-powered step-down substation and the nearby industrial and agricultural use Electricity. Zhaoping reservoir reinforcement after reinforcement, due to the project needs a hydropower station updated change