论文部分内容阅读
依据JG1 0 4 - 97规程 ,论述了现场负温砼冬期施工综合蓄热法的监理内容 ,并区别现行规范上对综合蓄热法及广义综合蓄热法明确不同的含义 ,以供寒区负温砼工程监理人员参考
According to the JG104-97 regulations, the supervision content of the integrated thermal storage method for the construction of field negative temperature and winter phase was discussed, and the difference between the integrated heat storage method and the generalized integrated heat storage method in the current specification was clearly defined so that the cold area was negative. Wenyu Project Supervisor Reference