此次会议开得很好,完成了部里交给我们的任务。会议任务有两个,一是对三门峡截流围堰的评价,一是如何推广三门峡截流围堰经验提倡快速筑坝。完成这次任务的原因,主要是三门峡工程局党委的直接领导和及时指示;王副局长和汪总工程师作了很好的报告,大会服务同志们的积极工作,全体到会同志们的努力。会议也有不够的地方,由于时间所限,不能详尽地研究和解决具体问题。可以预料,这次
The meeting was well organized and completed the task entrusted to us by the ministry. There are two conference tasks, one is the evaluation of Sanmenxia interception cofferdam, one is how to promote Sanmenxia interception cofferdam experience to promote rapid damming. The reason for accomplishing this task was mainly the direct leadership and timely instructions from the Party Committee of Sanmenxia Engineering Bureau; the deputy director Wang and Chief Engineer Wang made a very good report, and the assembly served the active work of the comrades and all the participating comrades went to work hard. There are not enough meetings, because of time constraints, can not be exhaustive study and solve specific problems. Can be expected, this time