本钢7号高炉(2850m3)自投产以来,一方面通过对新设备、新技术的消化吸收;另一方面通过深化内部管理,加强生产组织,找准基本操作制度,保证了生产的长期稳定顺行,提高了高炉应对外部条件(主要是原燃料条件波动)的变化能力。实现了高炉生产高产、优质、低成本的目标。本钢七号高炉高炉2850m3高炉是公司在淘汰1070m3级小型高炉后取而代之的一座现代化大型高炉,自2005年9月5日投产以来,一方面通过对新设备、新技术的消化吸收、锐意创新;另一方面通过深化内部管理,加强生产组织,找准基本操作制度。保证了生产的长期稳定顺行,提高了高炉应对外部条件(主要是原燃料条件波动)的变化能力,形成了自己的一套高强度冶炼体系[1]。实现了高炉生产高产、优质、低成本的目标。
Bengang No.7 blast furnace (2850m3) has passed the digestion and absorption of new equipment and new technology since it was put into production. On the other hand, through deepening internal management, strengthening the production organization and identifying the basic operation system, the long- The ability of the blast furnace to respond to external conditions (mainly fluctuating raw fuel conditions) has been improved. Achieved high-yield blast furnace, high-quality, low-cost goals. Bengang No.7 blast furnace blast furnace 2850m3 blast furnace is the company in the elimination of 1070m3 small blast furnace replaced by a modern large blast furnace since September 5, 2005 put into operation, on the one hand through the new equipment, new technologies to digest and absorb, keen on innovation; On the other hand, by deepening internal management, strengthening the production organization and identifying the basic operation system. This has ensured the long-term stability of production and improved the ability of the blast furnace to cope with changes in external conditions (mainly the fluctuation of raw fuel conditions), thus forming its own set of high-strength smelting systems [1]. Achieved high-yield blast furnace, high-quality, low-cost goals.