论文部分内容阅读
对沙钢3座2500m~3高炉的技术进步进行了总结。认为建立相应的管理和技术理念是沙钢炼铁生产和技术进步的基础,焦炭质量改善是沙钢高炉生产进步的关键,坚持贯彻“四高、两大、两低”操作方针是沙钢高炉技术进步的核心内容。
The technical progress of 3 2500m ~ 3 blast furnaces in Shagang was summarized. It is believed that the establishment of the corresponding management and technical concept is the basis for the production and technological progress of iron and steel production in Shagang. The improvement of coke quality is the key to the progress of blast furnace production in Shagang. To adhere to the operating principle of “four highs, two big and two lows” The core of progress.