江西赣江石虎塘航电枢纽工程坝顶门机是本工程机组安装的必备设备,是工程工期关键节点,门机安装完成后于2011年6月27日进行了负荷试验,参加人员有业主、监理、设计、安装和制造等各单位的代表。经过试运行、静载试验和动载试验,门机各项指标均满足设计文件和相关规范要求,顺利通过负荷试验。该门机为中水珠江设计公司独立设计的大
The dam door machine of Shihutang Hydropower Project in Ganjiang, Jiangxi is an essential equipment for the installation of this project unit and is a key node of the construction period. After the door machine installation is completed, the load test was carried out on June 27, 2011. The participants include owners, Supervision, design, installation and manufacture of representatives of various units. After the trial operation, static load test and dynamic load test, the door machine indicators meet the design documents and related specifications, successfully passed the load test. The door machine for water Pearl River Design Company independently designed large