论文部分内容阅读
江西水泥厂在上级领导部门支持下,采取自力更生与力争外援相结合的方针,坚持走技术进步的道路,针对矿石生产中的主要薄弱环节,对石灰石矿原生产工艺进行技术改造,并有所创新,在国内首次采用胶带输送机运载800毫米大块矿石成功。取得了显著的生产、技术和经济效果。现将情况简介如下。一改造前矿山概况江西水泥厂石灰石矿位于万年县大源公社河溪大队,距厂9.8公里。矿区构造为东西走向的向斜,地貌为孤山地形,比高250米,矿体为中上石炭系壶天灰岩,圈定工业储量8800万吨。
Jiangxi Cement Plant, with the support of the leading departments at the higher level, adopts the principle of combining self-reliance and striving for foreign aid and adheres to the path of technological progress. In light of the major weak points in ore production, the technological transformation of limestone mine production technology has been made and innovation has been achieved , The first time in China to use conveyor belt conveyor 800 mm large ore success. Achieved significant production, technical and economic results. Now the situation is as follows. A transformation of the former mine profile Jiangxi Cement Limestone Mine located in Wannian County Dahuan commune River Creek Brigade, 9.8 kilometers from the plant. The structure of the mining area is an east-west syncline with a geomorphic topography of 250 meters above sea level. The orebody is a middle-upper Carboniferous Hu Tian limestone, with an industrial reserve of 88 million tons delineated.