论文部分内容阅读
建筑安装工程合同,是业主与承包商之间的经济契约,是维护双方经济权益的法定文件,双方都要恪守履行。但是,再完善详尽的勘测设计和标书,在合同实施过程中,也会发生这样或那样的变更。如工程分项的增减、技术要求的修改、施工条件的改变等。这就涉及到如何计算费用问题;大的变更则涉及到工期的调整。如何合理计算合同变更费用?各单位各工 The construction and installation project contract is an economic contract between the owner and the contractor. It is a statutory document for safeguarding the economic rights and interests of both parties, and both parties must abide by it. However, the detailed survey and design and bidding documents will be further improved. During the implementation of the contract, one or more changes will also occur. Such as the increase or decrease of sub-items, the revision of technical requirements, the change of construction conditions, etc. This involves how to calculate the cost; large changes involve the adjustment of the schedule. How to reasonably calculate contract change fees?
其他文献
世界上最具影响、规模最大、水平最高的焊接展览会,公推在德国埃森举办的“国际焊接展览会”了。它是世界范围内焊接界的盛大节日和聚会,也堪称世界焊接领域的“奥林匹克”
云南劲牛劲钾肥有限公司采用芒硝转换法,建设年产10万吨结晶优质硫酸钾项目,总占地面积288374平方米,建设地点为安宁市连然镇大、小桃花村之间的青龙山麓坡地,工程主要建设内
当前控制工程造价的方式是,由设计单位根据初步设计编制初设阶段的概算,审查机关在审查初设时,同时审定工程概算,投资方及主管部门和有关单位,将审定的概算作为下达计划和具
今年美国焊接协会主办的2005焊接展览会,于4月26日-28日在达拉斯会议中心举办。这届展会是美国焊接协会单独主办的最后一届焊接展会, 从而结束了长达53年传统的由美国焊接协
气体分离设备分会于9月24——26日在山西太原组织召开了行业2012年统计信息工作会议,杭州杭氧股份有限公司、四川空分设备(集团)有限责任公司、开封空分集团有限公司、液化空
中国纸业网11月27日报道(摘要):2015年11月11-12日,斯道拉恩索中国区在海南省海口举办大型客户活动,共有180多位客户参会。本次活动以“向可再生材料成长性企业转型”为主题,
必胜网编译2015-10-21报道:美国林纸协会发布了2015年9月箱板纸统计报告2015年9月,美国箱纸板总产量比2014年同期下降了0.4%。9月的日平均生产量比8月的降低了3%。9月箱纸板
一、生产经营情况随着我国宏观经济的好转,西部大开发力度的加大和国家各项开放政策的进一步实施,我国电焊机行业2000年度总体经济运行较好,全年生产、销售和经济效益好于19
蓝月亮去污效果领先,综合评价较优;而保宁排名垫底,其中去污力有一项不达标,不作为推荐产品。  不同婴儿洗衣液产品的特色固有不同,但从“洗衣液是将衣服洗干净”这一最本质的功能出发,结合实际洗衣服过程中会遇到的皮肤刺激问题,究竟哪款婴儿洗衣液更值得信赖?  2014年12月,本刊送检了蓝月亮、爱护、贝亲、嗳呵、惠氏、保宁等6品牌婴儿洗衣液,基于第三方实验室的测评数据和主观测评结果,本刊给出了一个综合排
中国食品机械设备网2015-11-30报道(摘要):美国1996年美国环境保护总局(EPA)确立了垃圾管理政策:垃圾源头减量优先,包括重新使用和庭院垃圾就地堆肥;其次是再循环和堆肥;最后