论文部分内容阅读
第二季度的措施计划执行情况与第一季度相比较是有进步的,初步取得了一些经验和成绩,使措施工作逐步走向有计划的进行,同时由于第二季度的某些措施项目的按计划投入生产,给炼钢、轧钢、降温等——尤其是对一○四厂垫板新产品生产创造了有利条件,对下半年度生产起到一定的积极作用。如:各厂降温设备,由于各厂领导重视了这一工作,积极着手进行,在降温工作上收到了一定的效果,给车间工人生产创造了有得条件,特别是一○四厂生产技术副厂长徐宝升同志亲自动手组织进行这一工作,使降温设备在第二季度内连续的投入生产。如该厂小型车间空气淋浴投入生产后,测
Compared with the first quarter, the implementation of the measures in the second quarter was improved. Some initial experiences and achievements have been made to gradually move the measures toward a planned stage. In the meantime, due to some measures in the second quarter as planned Put into production, to the steelmaking, steel rolling, cooling and so on - in particular, to create a favorable conditions for the production of new products of one hundred and fourteen factory plate, play a positive role in the second half of the production. Such as: the plant cooling equipment, as the factory leaders attach importance to this work, and actively proceed with the cooling work has received some results, to create the workshop workers have conditions, especially the 104 factory production technology Comrade Xu Baosheng director personally organized this work organized so that the cooling equipment in the second quarter of continuous production. If the factory small workshop air shower put into production after the test