论文部分内容阅读
兴隆台采油厂难采储量较多且皆属于典型的低渗油田,注水开发效果差,油藏得不到经济高效开发。采取水力压裂技术改造低渗油层,可使低渗储层形成具有高导流能力、有足够长度的水力裂缝,增强地层导油能力,增大泄油面积,提高地层渗透率,进而提高原油采收率,实现显著的增产效果,为兴隆台采油厂原油生产提供有力的技术支持。
Xinglongtai Oil Recovery Plant is more difficult to reclaim reserves and all belong to the typical low permeability oilfield. The water injection has poor development effect and the reservoir can not be economically and efficiently developed. Taking hydraulic fracturing technology to transform low permeability reservoirs can make hydraulic fractures with high conductivity and sufficient length in low permeability reservoirs, enhance formation conductivity, increase drainage area, increase formation permeability, and then increase crude oil Recovery rate, to achieve significant yield increase, Xinglongtai oil production for crude oil production to provide strong technical support.