1进行动态的全过程造价控制(1)重视工程前期阶段的造价管理。对于投资金额大的项目,可以先上报设计方案,从技术和经济的角度出发,选择一个最优方案。而对金额少的项目直接进行工程设计。每个工程项目编制的施工图预算,应上报给项目主管部门审查,待项目批复后,再组织实施。(2)要对设计部门的设计变更进行考核。在签订设计合同时,应有设计变更考核条款,当设计变更原因造成预备费超过一定比例时,要对设计单位进行处罚,在设计费结算时扣除。(3)做好工程竣工结算工作。结算不能超预算,预算不能超概算。
1 for the whole process of dynamic cost control (1) emphasis on the early stages of project cost management. For projects with large investment amount, you can submit the design plan first, and choose an optimal plan from the technical and economic point of view. And the project of small amount of direct engineering design. The construction drawings and budgets compiled for each project shall be submitted to the competent department of the project for examination. After the project is approved, the project plans to be implemented again. (2) to design department design changes assessment. In the design of the contract, there should be design changes assessment terms, when the design changes caused by the reserve costs exceed a certain percentage, the design unit shall be punished, the design fee settlement. (3) Do a good job of completion of the project settlement. Billing can not exceed budget, the budget can not exceed estimates.