马来西亚巴昆坝为混凝土面板堆石坝,坝高205m,上下游坝坡均为1:1.4。选定方案的混凝土面板堆石坝总堆石方量为1730万m3,而在比较方案的研究中土心墙堆石坝的为2550万m3。采用混凝土面板堆石坝方案节省堆石方量约30%。对大坝的设计和选定混凝土面板堆石坝坝型的理由进行了详述,包括混凝土面板堆石坝与心墙堆石坝相比的重要优点、现场地质条件、根据土工试验和稳定分析成果(包括有限元分析)确定的设计参数等。最后简述了坝体分区的概念,重点说明了混杂硬砂岩与泥岩的堆石区,该区最大限度地利用了所需的开挖料中的软弱泥岩,从而大大缩短了工期,降低了费用。
Pakistan Batam Dam is a concrete faced rockfill dam with a dam height of 205m and upstream and downstream dam slopes of 1: 1.4. The total rockfill volume of the concrete faced rockfill dam of the selected scheme is 17.3 million m3, compared with 25.5 million m3 for the core-wall rockfill dam in the comparative scheme. Using concrete face rockfill dam program saves about 30% of rockfill. The design of the dam and the reasons for the selection of concrete faced rockfill dam types are described in detail, including the important advantages of concrete face rockfill dams and core rockfill dam, the on-site geological conditions, according to geotechnical test and stability analysis Results (including finite element analysis) to determine the design parameters. Finally, the concept of dam partition is briefly described, focusing on the rockfill area mixed with hard sandstone and mudstone, which maximizes the use of soft mudstone in the excavated material required, which greatly shortens the construction period and reduces the cost .