接地保护线烧伤人一、事故经过1994年4月6日下午3时许,某厂671变电站运行值班员接班后,312油开关大修负责人提出申请要结束检修工作,而值班长临时提出要试合一下312油开关上方的3121隔离刀闸,检查该刀闸贴合情况。于是,值班长在没有拆开312油开关与3121隔离刀闸之间的接地保护
Ground protection line burns people an accident After April 6, 1994 at 3 pm, a factory 671 substation operation on duty after taking over, the 312 oil switch overhaul responsible person to apply for an end to overhaul work, while the squad leader temporarily proposed to try Combine the 3121 isolation knife above the 312 oil switch to check the knife fit. Thus, the monitor did not open the 312 oil switch and 3121 isolated knife between the ground protection