赵固能源公司副井采用双层4车罐笼提升,提升系统形成后每班提升量在240车左右,提升量较大。建井初期因工业广场需要大面积回填,洗煤厂设计图纸尚未完成,永久翻矸系统不具备安装条件,建立临时翻矸系统势在必行,而且必须与副井提升量相匹配。这就要求临时翻矸必须快捷、高效、维护工作量低,并且投资少,运行维护费用少。赵固
Zhao Gu energy company vice wells with double 4 car cage upgrade to enhance the system after the formation of each class to enhance the amount of about 240 cars to enhance the larger. In the early stage of well construction, a large area of backfill was needed due to the industrial plaza. The design drawings of the coal washing plant were not completed yet. The installation of the temporary refuse system was not possible. It is imperative to establish a temporary refuse system and must match the amount of auxiliary shaft lift. This requires temporary waste gangue must be fast and efficient, low maintenance workload, and less investment, operation and maintenance costs less. Zhao solid