新疆乌鲁瓦提水利枢纽混凝土面板砂砾堆石主副坝和溢洪道土建工程招标举行现场考察会

来源 :水利水电技术 | 被引量 : 0次 | 上传用户:zhaolong0804
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
新疆乌鲁瓦提水利枢纽混凝土面板砂砾堆石主副坝和溢洪道土建工程招标现场考察会于1994年11月11R至13日在乌鲁瓦提水利枢纽工地举行.混凝土面板砂砾堆石主副坝和溢洪道土建标为乌鲁瓦提水利枢纽第二标,也是本工程投资额和建筑物规模均最大的土建标.本标由主坝、副坝、溢洪道 Urumqi, Xinjiang Water Conservancy Project Concrete Faced Grit Dam Main Auxiliary Dam and Spillway Civil Engineering Tender Site Inspection Meeting was held November 11, 1994 to 13 at the Uluwatu Hydro Project site. The concrete slabs of gravel and concrete of main spillway are designated as the second standard of Wuluwati Water Conservancy Project, and also the largest civil construction scale of the project investment and building scale. This standard by the main dam, auxiliary dam, spillway
其他文献
省建委于95年3月3日在福州召开了新型防水材料及UPVC水管推广应用协调会。参加会议的有全省各池市建委(建工局)负责同志、省L小VC管推广应用协作组成员和防水材料及UPVC管有关
Seventy-three large-superlarge deposits in China were formed in 4 metallogenic epochs, and located in 6 metallogenic domains. By combing their time-space distri
目的:研究癌基因和表皮生长因子在大肠癌中的表达与临床病理特征及预后的关系.方法:应用免疫组化S-P法检测57例大肠癌组织中C-erbB-2和EGFR的表达水平,应用计算机图象分析系统对C-erbB-2、EGFR的阳性细胞数密度进行检测、分析.结果:CerbB-2、EGFR在大肠癌中的阳性率分别为59.6%和56.1%.C-erbB-2和EGFR与瘤体的大小无明显相关性,与肿瘤的生长方式、是否有淋巴
The North China Craton (NCC) is one of the largest blocks composing the continent. Different types of continental margins well developed around the NCC, along w
In-situ excimer laser ICP-MS analysis of minerals of eclogites and garnet pyrox- enites from type localities (Shuanghe, Maowu, Bixiling, and Yangkou) in the Da
目的 探讨血清白细胞介素 6与原发性肝癌发生、发展、转移、疗效及预后的关系。方法 采用ELISA法 (双抗体夹心酶联免疫吸附试验 )检测了 6 8例原发性肝癌患者和 15例良性
三峡工程碾压混凝土第一阶段生产性现场试验在混凝土纵向围堰进行三峡水利枢纽分三期施工,第一期施工碾压混凝土集中在右岸混凝土纵向围堰、三期上游横向围堰下部,有碾压混凝土
平顶山市水利局为使河道管理纳入法治轨道,甘当第二被告,在法庭上宣传河道管理法规,刹住了在河道上乱建违章建筑物的不正之风。1993年7月10日,西杨村居民及附近群众505人联
在翻译教学中引入“内容为依托”的模拟项目翻译学习模式,以期建构翻译教学的理论认识和实践策略,提高教学质量。实验结果表明,该学习模式在翻译教学中成效明显,有助于提高学
我经常阅读的一本好杂志长江水利委员会技术委员会主任中国工程院院士原长江水利委员会副主任文伏波《人民长江》杂志创立于1955年8月,迄今已40周年。她是展示长江水利建设科学技术水