论文部分内容阅读
当前,随着国内经济社会发展愈加迅速,科学技术随之得以快速发展,并逐渐渗入至各行各业当中,在建筑工程领域表现得更加突出。文章以建筑工程前期阶段造价管理及控制方法为本次研究的主要内容,从综合考量各种影响因素、发挥项目法人基本职能、严格把握投资估算程序、严格把握标准设计程序、严格把握招标设计程序以及严格把握限额设计程序等方面详细剖析建筑工程前期阶段造价管理及控制方法,以期通过不断优化建筑工程前期阶段造价管理手段,对日后建筑工程公司建筑工程前期阶段造价管理及控制目标的实现提供参考建议,从而推动建筑企业良性发展。
At present, with the rapid economic and social development in China, science and technology have been rapidly developed and gradually infiltrated into all walks of life, making them even more prominent in the field of construction engineering. The article takes the cost management and control method in the early stages of construction as the main content of this study. From the comprehensive consideration of various factors, it exerts the basic functions of the project legal person, strictly controls the investment estimation procedure, strictly controls the standard design procedure, strictly controls the bidding design procedure And strictly control the quota design process and other aspects of the early stages of construction project cost management and control methods, with a view to continue to optimize the early stages of construction project cost management tools for the construction company in the early stage of construction cost management and control objectives to provide reference Suggestions to promote the healthy development of construction enterprises.