论文部分内容阅读
1事故描述2011年6月9日13时,某供电所值班室接到电话,小朱庄17组发生了触电死亡事故。供电所立即安排人员赶到现场,经调查了解,该村建房户黄裕宏,因建房需浇筑混凝土,便私自将振动泵电源线搭接到邻居黄明新家的表计出线侧用电。事发当日上午,黄某某在新建房屋的二层楼房上使用振动泵操作时造成触电,经抢救无效死亡。2事故成因建房户黄裕宏刚开始建房时,供电所电工夏某就曾多次告诫他要到供电所办理临时用电手续,不得私自搭接用电,并分别于2011年4月20日和5月10日先后两次剪断了他私自搭接的违章线路。电工夏某还
1 Accident description At 3:00 pm on June 9, 2011, a power supply station was on duty and a call was received. There was an electrocution accident in Group 17 of Xiaozhuzhuang. The power supply station immediately arranged for the personnel to arrive at the scene. After investigation, Huang Yuhong, who was building a house in the village, was required to pour concrete to build the house. She personally connected the vibration pump power cord to the neighboring Huang Mingxin’s meter outlets. On the morning of the incident, Huang Moumou used a vibrating pump to operate on the second floor of a new house and caused electrocution and died after being rescued. 2 Causes of the accident When the house owner Huang Yuhong first started building a house, Xiamou, an electrician at the power supply station, repeatedly warned him to go to the power supply station to apply for temporary electricity, and he must not be allowed to use the electricity without permission. They were respectively on April 20, 2011. On both the day and May 10, he cut off the illegal lines that he had spliced. Electrician Xiamou also