论文部分内容阅读
据悉,广州正开展新一轮地铁线网规划的优化调整,八号线、七号线和五号线分别计划延伸至广州北站、顺德和东莞。五号线调整方案:规划二期延长至黄埔客运港,并建议在黄埔客运港站预留继续向东莞望洪枢纽延伸条件,与东莞R1实现无缝衔接换乘。五号线:预留继续向东莞望洪枢纽延伸条件根据地铁线网规划,广州的三号线、五号线、十三号线、十六号线等线路与东莞仅相隔几公里。前年,广州和东莞签署《广州市-东莞市
It is reported that Guangzhou is carrying out a new round of optimization and adjustment of metro network planning, Line 8, Line 7 and Line 5 are planned to extend to Guangzhou North Station, Shunde and Dongguan. Line 5 adjustment program: the second phase of the planning extended to the port of Huangpu, and proposed to set aside in Huangpu Port to Hong Kong continue to Dongguan Hong Wang extension of the terminal, and seamless connectivity with Dongguan R1 transfer. Line 5: Reserve to continue to Dongguan Wang Hung extension conditions According to the subway network planning, Guangzhou Line 3, Line 5, Line 13, Line 16 and other lines and Dongguan only a few kilometers apart. Two years ago, Guangzhou and Dongguan signed the "Guangzhou - Dongguan City