论文部分内容阅读
首先从介绍三峡电源电站在三峡水利枢纽中的地位开始,指出了电源电站调速器在确保电源电站机组黑启动并实现枢纽恢复供电具有非常重要的作用,然后通过对电源电站调速器的组成结构、控制模式及调节规律、特点等方面进行了介绍,分析其实际运行情况并对运行中存在的问题进行了探讨。
Beginning with the introduction of the status of Three Gorges Power Station in the Three Gorges Project, it is pointed out that the governor of power station plays a very important role in ensuring the black-start of power station units and the restoration of power supply to the hub. After that, Structure, control mode and regulation rules, characteristics and other aspects were introduced, analyzed the actual operation and the problems in operation were discussed.