论文部分内容阅读
过去在坑道大巷内敷设永久点时,我们是用粗约四厘米,长约二厘米的金属黄铜杆标敷设,这样做需要石工帮助打很大的眼位,敷设一组(一组是三个测点)永久导线点花费的时间工效及洋灰很多,故此种敷设法是有改进的必要,经组内同志改进,想出了简
In the past, when laying permanent points in tunnel lanes, we laid it with a metallic brass rod roughly four centimeters in length and about two centimeters in length. To do so, we needed masonry to help a great eye position and set up a group Three measuring points) permanent wire point of time spent a lot of work and foreign cement, so the laying method is to improve the need to improve the group comrades, came up with Jane