近年来,高强度预应力混凝土桩被推广应用于房屋建筑地基处理中,早期管桩施工常采用锤击法,但锤击桩的施工噪声大,拌有浓烈的烟雾和油污等缺点,尤其在市区中心和居民区内的施工中,影响居民正常的生产和生活。以液压法压入式施工桩工艺替代锤击,既大大减少了噪声,对环境的污染也很小,所以被广泛的应用。本文就介绍预应力管桩静压法施工的管理、控制要点、常见问题及解决办法、桩的质量控制措施。
In recent years, high-strength prestressed concrete piles are widely used in the construction of the foundation of houses and buildings. In the early days, the hammering method was often used in the construction of pipe piles. However, the construction noise of the hammer piles was large, with strong smoke and oil stains, Urban centers and residential areas in the construction, affecting residents of normal production and life. Hydraulically pressed into the pile construction process instead of hammering, not only greatly reducing the noise, environmental pollution is also very small, it is widely used. This article introduces the prestressed pipe pile static pressure construction management, control points, common problems and solutions, pile quality control measures.