河南超化矿主井净直径4.5m,井深289m(包括3m水窝)。井筒临时改装设备包括一对lt单车临时罐笼、8根绳罐道及如图1所示的其它管缆线路。改装工作由河南煤矿建井三处一工区机电队承担,自1984年12月27日至1985年1月1日历时5天完成全部改装,经试车验收后投入正常运行。 主井临时改装是矿井立转平施工的一项联锁工程,也是一项复杂而细致的工作。为
The main diameter of Henan Chaohua mine is 4.5m in diameter and 289m in depth (including 3m water nest). The temporary wellbore modification equipment includes a pair of lt temporary bicycle cages, eight rope lanes and other pipelines as shown in FIG. 1. The conversion work was undertaken by the electromechanical team in the work area of three coal mines in Henan Coal Mine. From December 27, 1984 to January 1, 1985, all the refitings were completed within 5 days. After being tested and accepted, the test vehicle was put into normal operation. The temporary modification of the main shaft is an interlocking construction of the mine turning and leveling construction and is also a complicated and meticulous work. for