论文部分内容阅读
在最近重新评估法国拉拉耶大坝的设计洪水之后,打算扩建该坝的泄洪建筑物。介绍了将于2008年完成的新的非常溢洪道的创新设计和模型研究。
After recently re-evaluating the design floods at Laraya Dam in France, it plans to expand the dam’s flood-releasing structures. Introduced the innovative design and model studies of the new very spillway to be completed in 2008.