从2004年12月24日快速公交1号线木樨园-前门段试运营至今,北京市引入国外快速公交系统(Bus Rapid Transit,简称BRT)进入第5个年头。当时参与试运营的是10辆常州客车厂生产的国内第一批依维柯BRT客车。在5公里的路段内试运营一年后,快速公交1号线于2005年12月底全线贯通,全国首条达到国际高载客量水准的BRT线路正式投入使用。
From December 24, 2004 Express Bus Line 1 Muxiyuan - the front door trial operation so far, Beijing introduced the rapid transit system (Bus Rapid Transit, referred to as BRT) into its fifth year. At that time involved in the trial operation is 10 Changzhou Bus Factory produced the first batch of Iveco BRT bus. After one year of trial operation within the 5 km road section, BRT Line 1 was fully connected at the end of December 2005 and the first BRT line in the country, which reached the international high-load-carrying capacity, was officially put into operation.