论文部分内容阅读
委内瑞拉卡鲁阿奇水电工程导流底孔目前已封堵 ,以便第一台机组进行发电试验。在西班牙UPC大学 (UniversitatPolitecnicadeCatalunya)进行了模型试验研究 ,以便分析导流闸门的水力学特性。对导流底孔的流量和掺气量、压力、振动和作用于闸门的下曳力进行了分析
Venezuela’s Caruqi hydroelectric project diversion bottom has been blocked, so that the first unit for power generation test. A model test study was conducted at Universitat Politecnicade Catalunya in Spain in order to analyze the hydraulics of the floodgate. The flow and aeration volume, pressure, vibration and the drag force acting on the gate were analyzed