论文部分内容阅读
结合山区建筑地基的特点,通过合理的地基基础设计,解决了基础不均匀沉降以及稳定问题;与总图、建筑专业密切配合,根据勘察报告岩土分布情况以及现场实际情况,严格控制土石方的开挖量,减小施工难度,缩短工期,达到降低工程综合造价目的。总结山区不均匀地基基础常用的处理方法,对类似山区建筑地基基础设计提出几点有益的建议。
Combined with the characteristics of mountain building foundation, through a reasonable foundation design to solve the uneven foundation settlement and stability problems; and general plans, construction professionals in close cooperation with the investigation report according to the distribution of rock and soil conditions, the actual control of the earth and rock Digging, reduce the difficulty of construction, shorten the construction period, to reduce the project’s comprehensive cost. Summarizing the commonly used treatment methods of uneven foundation in mountainous area, some useful suggestions are put forward for the design of foundation of similar mountainous buildings.