实施性施工组织设计是施工组织管理的核心和灵魂,是对工程项目全过程的构思设想和具体安排,用来指导施工项目全过程各项活动的技术、经济和组织的综合性文件。具体包括施工总体部署、施工准备、进度指标、工装、人员配置、物流组织、工程质量保证措施、施工现场管理措施等,需将诸多因素尽可能考虑充分,突出其科学性、适用性及针对性,确保优质、低耗、安全、高速完成全部施工任务。本文就××客运专线××标无砟轨道施工中,面临工期紧、任务重、无砟轨道标准高、交叉作业多、地方协调难度大等情形开展的施工组织技术管理进行论述。
Implementation Construction Organization design is the core and soul of construction organization and management. It is a comprehensive document on the technical, economic and organizational aspects of the whole process of project construction, which is intended to conceptualize and make concrete arrangements for the whole process of construction projects. Specific requirements include overall construction deployment, construction preparation, progress indicators, tooling, staffing, logistics organization, engineering quality assurance measures, construction site management measures and so on. Many factors need to be considered as fully as possible to highlight their scientificity, applicability and pertinence , To ensure high quality, low consumption, safety, high-speed completion of all construction tasks. In this paper, × × passenger dedicated line × × standard ballastless track construction, the face of tight schedule, heavy task, ballastless orbit standard high, cross-operation and more difficult to coordinate the construction organization and technical management.