论文部分内容阅读
城北村是太原市郊区的一个村庄,北临晋阳湖(系一人工湖),村基较湖池水面约低一米,由于蓄水的渗透,使该村地下水位上升,村内常年泥濘潮湿,房舍由于水碱浸蝕坍塌现象严重,因之经太原市委和市人委研究,批准将该村迁建,并委托我院设计。社员住宅由农民施工队承包,自1963年8月开工至11月初竣工。公共建筑由省建筑公司施工,自9月份开工至11月中旬基本完成。
Chengbei Village is a village on the outskirts of Taiyuan City, and Jinyang Lake (a man-made lake) is on the north. The village base is about one meter lower than the surface of the lake basin. Due to the infiltration of the impounding water, the groundwater level of the village rises, and the mud in the village is perennial. Due to the serious water-alkali leaching and collapse, the premises were seriously damaged. As a result of the study by the Party Committee of the Committee of the Party Committee of Taiyuan City and the People’s Committee of the City, the village was approved to be relocated and the design of the hospital was entrusted. The dwellings of the members were contracted by the farmers’ construction team and were started in August 1963 and completed in early November. The public buildings were constructed by the Provincial Construction Company and were basically completed from September to mid-November.