论文部分内容阅读
南津渡水电站计算机监控系统1991年、1993年分别由奥地利ELIN公司和南京自动化研究所各自独立设计,两套系统均在DOS下运行,由于技术老化,系统基本处于闲置状态。
The computer monitoring system of Nanjindu Hydropower Station was independently designed by ELIN Company of Austria and Nanjing Institute of Automation in 1993 and 1993 respectively. Both systems are operated under DOS. Due to the aging of technology, the system is basically idle.